The full project page is available on the Friends of the Goffstown Rail Trail page here. The project page contains images and links about the use and difference between the new pedestrian control signals on 114 and Henry Bridge Road.
Project Summary:
This project consists of multiple improvements at four sites on the Goffstown Rail Trail. These are:
- Realign and mark the trail crossing of Mast Road near the Villa ball fields, so that the trail will cross perpendicular to the road.
- Install a Pedestrian Hybrid Beacon (PHB) user-activated crossing light at this location.
- Create a 12 space parking area at the west side of the above crossing.
- Realign and mark the trail crossing of Mast Road near Pro Landscape, so that the trail will cross perpendicular to the road.
- Install a PHB crossing light at this location as well.
- Fill in the gully left when the old railroad trestle over the former Henry Bridge Road was removed.
- Install crossing markings and a Rectangular Rapid Flashing Beacon (RRFB) at Henry Bridge Road, and cut back the hillside slope to improve sight distance.