2023 South Mast St / East Union St project

The 2023 Road Plan includes drainage upgrades to South Mast Street between Pineridge Drive and the Wallace Road roundabout, followed by reclaim of the existing asphalt and repaving.
 
In conjunction with this work, the East Union St project will also be completed, which includes drainage and a new 8' wide mixed-use sidewalk to connect to the Goffstown Rail Trail at each end. New sidewalk will also be added to connect South Mast St to the Rail Trail. Work will begin after the school district summer break begins. Project plans are available HERE.